One upgrade we've been wanting to make is replacing our upstairs bathroom vanity with the model shown below. With my brother-in-law's help (really the other way around), we first removed the old vanity which was so strongly caulked it took several tools, including a crowbar, to finally pop it free. The new vanity posed its own challenges. The holes for the faucet handles were not predrilled wide enough so it required a trip to the hardware store to buy a rounded file. Three of the drawer handles needed two long flat-head screws, but only four were included, so that took another trip to the hardware store. One more trip to the hardware store was needed to buy a longer PVC tailpiece (more on that in a couple of days), bringing the number of trips to three, which is about average for a project like this. The result was beautiful and worth the work.
Huge shoutout to Albert for taking his morning to make this a reality!
No comments:
Post a Comment